Building Construction Permit (PBG) Services

Providing building construction permit services from document preparation to permit submission

PBG Services

Building Construction Permit (PBG)

In the building construction process in Indonesia, the Building Approval (PBG) is an official document required before construction begins. This document replaces the Building Construction Permit (IMB) in accordance with the Job Creation Law.

We help you prepare technical documents according to national standards so that construction permits are issued without administrative obstacles through the SIMBG system.

The benefits you get from our building permit service include legal security throughout the construction process, a valid and easily usable property document, and ensuring your building design is efficient and safe from the planning stage.

Building Approval

PBG Assistance from Start to Issuance

We assist with the entire Building Approval process, from document preparation and technical calculations to coordination with relevant authorities.

Our Process & Methodology

1

Working Drawing Preparation

Architecture, structure, and utilities that comply with technical standards and Building Approval requirements.

2

Structural Technical Calculation

Including seismic load analysis, soil bearing capacity, and structural calculations according to the latest SNI standards.

3

SIMBG Data Input

Handling registration, document uploads, and periodic monitoring of the submission process on the SIMBG system.

4

TPA/TPT Session Coordination

Representing clients in presentations and technical discussions with government expert teams through to approval completion.

Advantages of Our PBG Service

We don't just assist with the permitting process — we also ensure all technical documents are properly prepared for a safer and more efficient process.

Faster & More Efficient Process

Our team understands the regulatory flow and technical requirements, minimizing revisions and speeding up the submission process.

Building Legal Certainty

Ensuring the building meets all applicable legal and regulatory provisions to avoid future risks.

Cost Savings

Proper planning helps avoid administrative or technical errors that could incur additional costs.

Frequently Asked Questions About PBG Permits

Questions commonly asked by clients regarding PBG permits

Is the old IMB still valid, or do I need to switch to PBG?

+

The IMB remains valid as long as there are no changes to the building's structure or function.

What if I want to change the building's function?

+

You are required to submit a PBG Change application according to the new intended function.

Does PT. JTI serve PBG needs across all of Indonesia?

+

We provide PBG consulting and processing services nationwide through the online SIMBG system.

How much is the PBG retribution fee?

+

The retribution fee is calculated automatically by the SIMBG system based on the area and function of your building.

Still Have Questions?

Contact us for a consultation on your needs, Free of charge!

Consultation